A +/- 0.001 mm callout is meaningless if the datum scheme is wrong. We walk through how to specify tolerances your supplier can actually hold, and quote you once.
Design guide
Tolerances on the drawing vs tolerances on the shop floor
Bring a part
Have a related question or project?
Send us a STEP or PDF with the critical tolerances. Engineering sends an initial response within one business day. The quotation and lead time are confirmed after drawing review.
Start a quote ↗