Back to all posts

Design guide

Tolerances on the drawing vs tolerances on the shop floor

Published March 9, 2026

A +/- 0.001 mm callout is meaningless if the datum scheme is wrong. We walk through how to specify tolerances your supplier can actually hold, and quote you once.

Bring a part

Have a related question or project?

Send us a STEP or PDF with the critical tolerances. Engineering sends an initial response within one business day. The quotation and lead time are confirmed after drawing review.

Start a quote ↗