Records agreed for each batch

  • First-article inspection against the released revision of the drawing.
  • In-process CMM measurements on tight-tolerance features, not only at the end.
  • Material certificates and batch IDs, auditable on request.
  • Final inspection record, packing photos and export documents.

How deviations are handled

  • Any drift past a documented tolerance is escalated to your engineering contact within one working day.
  • We do not ship out-of-spec parts and quietly hope no one notices.
  • Every escalation comes with a documented root cause and the corrective action taken for the next batch.

See the documents

Agree the records needed for your batch.

Send a part number or a sample drawing. We will confirm which inspection records the quotation will include. A redacted sample report is not attached on this page.

Agree the records for this part ↗